CASE STUDIES

Success
Stories

National Space Centre, Leicester

Rigging inspection

The Challenge:
Our client needed a comprehensive inspection to fixed rigging points on various delicate models at the National Space Centre.

The Process:
Using a combination of rope access and MEWPs, our technicians were able to get up close and personal with the exhibits to assess their condition. 

The Result:
We provided a detailed photographic report outlining our findings, which not only put our client’s mind at ease but means that the exhibits are safe for the public to enjoy for years to come.

Tottenham Hotspur Stadium

Lift shaft works

The Challenge:
In the face of time pressures and multiple simultaneous operations, our client needed a means of safe access to internal lift shafts so that final touches could be completed. To complicate matters, all equipment had to be installed and removed at the beginning and end of each shift to enable other contractors to continue their works. 

The Process:
Over a number of months, our technicians worked through the night to clean all structural elements and glazing, as well as installing cladding panels, painting steelwork and assisting our client with other miscellaneous works.

The Result:
Ninja Access have built a strong working relationship with one of the leading architectural metalwork specialists in the UK and are proud to have been involved with one of the largest construction projects in London.

Amazon Depot Milton Keynes

Deep clean

The Challenge:
When our client was let down at the last minute, Ninja Access were tasked with ensuring that a newly refurbished depot was ready for unveiling.

The Process:
Using traditional window cleaning techniques, we worked tirelessly to clear all dust, dirt and debris from every nook and cranny of the atrium in record time.

The Result:
Sparkling clean windows, a team of tired & hungry rope techs, and (most importantly) one very satisfied customer!

Have a project in mind that requires our services? Please contact us today.